Boiler inspection procedures

- Check the records, resumes equipment;

- Check technical outside, inside;

- Check technical testing;

- Check the operation;

- Handling of inspection results.

Note: The next step test is conducted only when the test results in the previous step unsatisfactory. All the test results of each step must be fully recorded in the field notes in the form prescribed in Annex 01 and stay fully in accrediting organizations.

Boilers (boilers) how is not tested?

The boilers have a working pressure of 0.7 bar is slightly larger, water heating pot of water temperature 115 ° C greater than on the list of machinery, equipment and supplies have strict requirements occupational safety by the Ministry of Labour - Invalids and Social Affairs.

For how boiler does not need accreditation ?

- Boilers with greater pressure 0.7 bar but steam and water holding capacity of not more than 25 liters and the product between the volume (in liters ) and pressure ( measured in bar) shall not exceed 200 ;

- Boilers running on nuclear energy ;

- Binh evaporation heat source is steam coming from elsewhere included ;

- Boilers running on solar energy ;

- Boilers running on electrical energy ;

- The boiler placed on trains, ships and other means of transport .

Inspection of boilers (boilers) when?

- Technical expertise Safety first: As the assessment of technical safety condition of boilers, hot water boilers according to the national technical regulations and standards of safety techniques after installation and before when put into use for the first time.

- Technical expertise periodic safety: As the assessment of technical safety condition of boilers, hot water boilers in accordance with the national technical regulations, technical standards secure the expiration of time check nails before.

- Technical expertise extraordinary safety: As the assessment of technical safety condition of boilers, hot water boilers in accordance with the national technical regulations, technical standards Safety:

+ When using the boiler and hot water boilers have ceased operation for 12 months or more;

+ After the repair, upgrade or renovation may affect the safety of technical condition of boiler and hot water boilers;

+ After changing the installation position;

+ Upon request of the establishment or the competent authorities.

Boiler inspection deadline: Please contact the sales department to get the best price.