The urban planning of the new general be performed in 2 steps : preparation, approval planning tasks and preparation, approval planning schemes .
 
 
 
 
A lesson about urban planning for students of Vietnam in Australia
 
In planning tasks must determine the scale, scope reasonable for general urban planning based on scientific foundations and practical; potential, power, and formed the basis for urban development. Ensuring consistency with the current state of the natural conditions, economic, social and regional specific matching provincial regional construction planning.
 
For new urban expected grade V (without suburbs), planning boundary determined only on the scope of regional development focus and the surrounding areas are urban trend chemical, not determined by the commune's administrative boundaries.
 
The forecast, calculated population size, land under the planning stage should be based on the current status of the population in the planning area. The planning criteria must comply with the standards in force.
 
Development of new general urban planning should be consistent with the overall mission of urban planning newly approved by competent authorities.
For new urban case referred to in the document No. 18 / HQH - VP dated 19/06/2015 of the planning before the provincial People's Committee approved the general plan must have the consent in writing of the Ministry of Construction .
 
Planning scheme approved new urban general as a basis for setting urban classification scheme .
 
Compositional profile and content plan of a new urban center should be fully comply with the content as prescribed in Article 18 of Decree No. 37/ 2010 / ND - CP of the Government dated 07/4/2010 , Circular No. 10 /2010 / TT - BXD dated 11/8/2010 , Circular No.01 / 2011 / TT - BXD dated 27/01/2011 of Circular No. 06 / 2013 / TT - BXD dated 05/13/2013 the Ministry of Construction .

 

News other